Laboratory renovation project
National service hotline0755-29103270

Recommended case

Positive control room

Author: Shenzhen Zhongjing Global Purification Technology Co., Ltd.Time:2018-07-26 14:59:24Views:3599

Positive control room
  • Positive control room

The construction goal of the positive control room is to check and verify the results of the microbial testing room test, mainly three key points, *: negative pressure million level second: configuration biosafety cabinet third: guarantee a certain pressure gradient, clean room-positive In the control room and the biological safety cabinet, the positive control room uses a separate air conditioning system, the purification level is 10,000, and the positive control room is negative pressure relative to the adjacent buffer chamber. The biosafety cabinet protects people, the environment, and samples.


Positive control room construction opinion

1, a more cleanliness can not be required, most of what I see is efficient air supply, you can make 10,000. One can also have a wash basin or a hand sterilizer (the room is too small to set up a wash basin is not convenient). Ultraviolet germicidal lamps should be provided in one. A more pair of shoes should maintain a positive pressure.

2. The cleanliness of the second is 10,000, and the second should be kept at a positive pressure of not less than 10Pa. Ultraviolet germicidal lamps should be installed in the second.

3. The cleanliness of the positive control room is 10,000, and the positive pair should be kept relatively negative. A biosafety cabinet (also available as a vertical laminar flow table) should be provided in the positive control room. Ultraviolet germicidal lamps should be provided in the positive control room. A transfer window with an ultraviolet lamp should be provided between the positive control room and the preparation room.

4. There are no special requirements for the shoe area.

5. There should be a sink and UV lamp in the preparation room. A normal air conditioner can be installed in the preparation room. A side table is usually set in the preparation room.

6, one more, two more, positive control three rooms can use a clean air supply system, this system is a new wind system, the air can not be recycled. Exhaust air can be directly discharged to the outside (there are many powerful units that are also installed in the exhaust air, and the exhaust air is efficiently filtered and then discharged to the outside. The indoor temperature and humidity are controlled at 18-26 ° C, 40-60%. Illuminance Not less than 300 lux.

7. Nowadays, PVC floor is usually used, and color steel plate is used for the envelope structure.

Undertake: sales and installation of purification equipment across the country

Get quotes quickly

*The quotation will be sent to your mobile phone as a text message or contact a professional technician to contact you.

  • *
  • *
  • *
主站蜘蛛池模板: 国产中文在线播放 | 国产下药迷晕一区二区三区在线看 | 天堂久久一区二区三区 | 国产欧美精品一二三 | 97国产suv精品一区二区62 | 色av色av色av | 久久国产在线观看 | 95免费视频 | 久久久久久久久久久身材好 | 日韩精品一区二区三区中文在线 | 中文字幕无码不卡一区二区三区 | 国产边打电话边被躁视频 | 女人被狂躁C到高潮 | 在线观看一区二 | 亚洲精品国偷自产在线91正片 | 猫咪免费人成网站www在线 | 久久久久久久久久免费高清 | 国产综合欧美无毒不卡怡红院 | 国产精品四 | 真人做爰片免费毛片中文 | 91av成年影院在线播放 | 日韩日韩日韩日韩 | 日韩免费A级毛片无码 | 久久亚洲二区三区 | 国产免费观看黄AV片 | 亚洲精品一区二区三 | 四虎影视国产精品 | 丰满人妻一区二区三区无码av | 久久久久久久久浪潮精品 | 国产精品久久久久久久久侵犯 | 日本不卡免费新一二三区 | 国产一级淫片免费视频 | 国产精品亚洲五色 | 羞羞色院91蜜桃 | 欧美日韩在线视频不卡一区二区三区 | 国产精品久久久久久一区 | 国产精品久久久久久av | 中文字字幕码日产高清 | 国产区精品视频线二代 | 国产精品一区99 | 久久久99日产 |